#OperationsManagerRuss was out in the #BayOfPalma last week with #raceyacht #SYAragon, having had her brand new carbon fibre #rig stepped. #RiggingInPalma www.rsb-rigging.com

Once the rig is in place and the standing ‪#‎rigging‬ connected the ‪#‎mastjacks‬ can be pumped up to apply tension to the shrouds allowing the crane to unload the lifting strops. #SYAragon #RiggingInPalma

#OperationsManagerRuss was out in the #BayOfPalma with #raceyacht #SYAragon. This has been a great project for us, and another successful #retrofit from our #riggers. #RiggingInPalma www.rsb-rigging.com

Great job from the riggers for yet another successful re-step. #SYAragon #RiggingInPalma

The procedure starts with both cranes lifting the rig horizontally before the main crane continues the lift and the smaller crane lowers and manoeuvres the butt until the mast is vertical. #SYAragon #RiggingInPalma

Our main projects over the last week have been with Marten 72 #SYAragon, Industrias jmv built #SYBlueDiamond, and Pendennis Shipyard Ltd built #SYChristopher, to name a few. Footage of #MaxiYacht #SYAragon #racing in the 6th edition of the #StBarthsBucketRegatta... #RiggingInPalma‬ www.rsb-rigging.com

The boom is swung into position and the gooseneck connected before the hydraulic vang is hooked up and is able to take the weight of the boom. #SYAragon #RiggingInPalma

This is a procedure that at times requires minute movements to position the mast on the step correctly and is not a job for the feint of heart! #SYAragon #RiggingInPalma

With the procedure completed the cranes are signed off and the decks and mast step area are tidied up in preparation for the ‪#‎rig‬ tune. #SYAragon #RiggingInPalma