Demo ceiling and insulation to prep for interior framing. Ceiling was sagged >1.5"  Nov 18

Demo ceiling and insulation to prep for interior framing. Ceiling was sagged >1.5" Nov 18

Demo ceiling and insulation to prep for interior framing. Ceiling was sagged >1.5"   Nov 18

Demo ceiling and insulation to prep for interior framing. Ceiling was sagged >1.5" Nov 18

Feb 25 Drywall and ceilings, ready to hang doors

Feb 25 Drywall and ceilings, ready to hang doors

Plumbing site visit, remove interior doors, prep cabinets Nov 21

Plumbing site visit, remove interior doors, prep cabinets Nov 21

Demo electrical, framed interior walls Nov 19

Demo electrical, framed interior walls Nov 19

Demo all area of roof per print. Also demoed existing exterior wall on front for new elevation.  Jan 14

Demo all area of roof per print. Also demoed existing exterior wall on front for new elevation. Jan 14

Front wall to be pushed out Oct29

Front wall to be pushed out Oct29

OBTAINED BUILDING PERMIT Finished interior framing, replaced and painted mailbox cover, clean interior  Nov 20

OBTAINED BUILDING PERMIT Finished interior framing, replaced and painted mailbox cover, clean interior Nov 20

Feb 14 New insulation in addition

Feb 14 New insulation in addition

Carport/porch gone. Front ready for demo Nov12

Carport/porch gone. Front ready for demo Nov12