We continue on with the backfilling process and water.

We continue on with the backfilling process and water.

3,500 pound fiberglass pool being lowered into the ground.

3,500 pound fiberglass pool being lowered into the ground.

2:30 pm we finish installing the skimmer on the pool.

2:30 pm we finish installing the skimmer on the pool.

The Hot tub is about to be installed shortly.

The Hot tub is about to be installed shortly.

Spreader beam installed and ready to be lifted safely into hole.

Spreader beam installed and ready to be lifted safely into hole.

Installing expansion Joints in this soon to be brushed deck.

Installing expansion Joints in this soon to be brushed deck.

Time to remove dirt and start installing the stone base.

Time to remove dirt and start installing the stone base.

11:30 the plumb strip is installed for Cantilever coping.

11:30 the plumb strip is installed for Cantilever coping.

The installation of the decking is going smooth.

The installation of the decking is going smooth.

The 4 inch base is ready for final grading.

The 4 inch base is ready for final grading.