R&H Engineering once again recognised for Quality and Consistency In August 2015, R&H Engineering first achieved ISO9001 rating, and it’s business stepped up a gear. This marked a change in strategic...

R&H Engineering once again recognised for Quality and Consistency In August 2015, R&H Engineering first achieved ISO9001 rating, and it’s business stepped up a gear. This marked a change in strategic...

The Waiheke Island community proudly opened it’s new Public Library in July 2014. It was four times the size of it’s predecessor, and had many design elements drawn upon local iwi traditions. When the plans called for an elevated treehouse ...

The Waiheke Island community proudly opened it’s new Public Library in July 2014. It was four times the size of it’s predecessor, and had many design elements drawn upon local iwi traditions. When the plans called for an elevated treehouse ...

Fabricating off-site lead to shorter time on site, and better quality finish. One of the most satisfying aspects of our job is that, while we’re often a key part of big projects, our work goes pretty much unnoticed by the ...

Fabricating off-site lead to shorter time on site, and better quality finish. One of the most satisfying aspects of our job is that, while we’re often a key part of big projects, our work goes pretty much unnoticed by the ...

rhengineering-auckland-we-supply-08 copy

rhengineering-auckland-we-supply-08 copy

Pinterest
Search